Scudder Demolition was appointed by Gardiner & Theobald as Principal Contractor to undertake the demolition and associated asbestos removal works as part of the regeneration of Bracknell Town Centre.

Our works included the disconnection and diversion of utility supplies throughout the site. Eco hoarding was erected around the perimeter of the site, after which our team provided a refurbishment and demolition survey for all of the 100+ retail units, after which we undertook a complete soft strip and the safe removal of all associated asbestos.

Our team liaised closely with the client and Bracknell Regeneration Ltd to ensure that their additional needs for programming, phasing and hoarding were met.

Following the successful completion of the above works, our team and Careys Civil Engineering were awarded additional works including construction of a road bridge and two pedestrian underpasses as part of an S278 package.